🎉 Celebrate with 10% OFF on All Products! Use Code: GFEX10 Or Buy Any 2+ Items for 30% OFF with Code: GFEX30!
Guides & Tutorials November 1, 2026

How to Run a Supplier RFQ and Compare Sealed Bids with Gravity Forms

GravityExtra
How to Run a Supplier RFQ and Compare Sealed Bids with Gravity Forms

Most small and mid-sized organisations buy the same way: someone e-mails three or four suppliers, asks for a price, and waits. The replies come back in different formats — a PDF here, a price in the body of an e-mail there, a spreadsheet with different units somewhere else. Somebody copies the numbers into a sheet, a supplier asks a question that only they get the answer to, a late price arrives after the others have been opened, and at the end it is hard to show why one supplier won. None of that is anybody’s fault. It is simply what happens when a request for quotation (RFQ) runs through a shared inbox.

This guide shows how to run a cleaner RFQ from your own WordPress site: one request with clear line items, a private link for each supplier, sealed bids with a real deadline, questions answered for everybody, and a side-by-side comparison with transparent scoring. We use the Gravity Forms Supplier RFQ & Bid Comparison add-on, but the checklist works however you choose to collect prices.

What a good request for quotation needs

Before looking at any tool, it helps to be clear about what makes an RFQ fair and easy to compare. Five things matter most:

  • The same question for everyone. Every supplier should price exactly the same list: the same items, the same quantities, the same units and the same documents. If one supplier quotes per box and another per piece, you spend your time converting instead of comparing.
  • A real deadline. A deadline only means something if a price that arrives late is not quietly added to the pile. That is hard to do in an inbox, where a late reply looks just like the others.
  • Sealed bids. If the buyer can see prices as they arrive, it is tempting to call the most expensive supplier and hint at a number. Even if nobody does that, suppliers who suspect it happens will pad their first price. Keeping bids sealed until the deadline protects both sides.
  • Equal information. When one supplier asks a good question, the answer usually matters to everyone. Answering only the person who asked gives them an advantage and makes the bids harder to compare.
  • A record. Months later someone will ask why the contract went to a particular supplier. A short trail — who was invited, when bids came in, what was asked and answered, how the bids were scored and who decided — answers that in a minute.

Step 1: describe what you are buying as line items

Start with the list. Break the purchase into lines with a quantity and a unit: 400 pieces of a bracket, 1,200 bolts with nuts, one lot of delivery to site. Add a short specification where it matters (material, finish, size) and put the details in a document — a drawing, a specification sheet or your terms. Suppliers then enter a unit price for each line, and the totals are calculated the same way for everyone.

The RFQ editor: title, description, deadline, sealed bids option, three line items with quantity and unit, and three suppliers with contact name, company and e-mail
Line items, suppliers, deadline and the sealed bids option in one screen.

In the add-on this is a single screen under Supplier RFQs → New RFQ: title, description, deadline, the sealed option, the line items and the suppliers. Documents you attach are stored in a protected folder rather than the public media library, and suppliers download them through their own link.

Step 2: choose who to invite and how bids will be scored

List the suppliers you want prices from with a contact name, company and e-mail address. Three to five is usually enough for a routine purchase. Then decide, before any price arrives, how you will judge the bids. Deciding afterwards is where most arguments start.

The add-on scores price and lead time automatically and lets you add your own criteria such as quality, service or warranty. Each criterion gets a weight from 0 to 100. A typical routine purchase might use price 60, lead time 20 and quality 20; an urgent one might weigh lead time more heavily. Price is scored as the lowest total divided by each total, times 100, so the cheapest bid scores 100 and a bid that is 10 percent dearer scores about 91. Lead time works the same way with days. Your own criteria are marked from 0 to 10 per bid after the deadline.

Step 3: send private links, one supplier at a time

When the request is ready, send the invitations. Each supplier gets one e-mail addressed only to them, with the deadline and a private link. There is no CC list, so suppliers do not learn who else was invited — which also stops two suppliers from comparing notes.

The private link is signed: it contains the request, the supplier and a signature made with a secret key that only your site knows. If someone changes the supplier number in the address to peek at a competitor, or shortens the signature, the page refuses with “This link is not valid” and shows nothing. If a link goes to the wrong person, you send that supplier a new link and the old one stops working straight away.

Step 4: let suppliers bid through a simple form

The supplier page: RFQ reference, deadline, line items, the drawing to download and the bid form with a unit price per line, lead time, validity, notes and a file upload
The supplier page: the request, the documents and the bid form.

The supplier page shows the request, your documents, the published questions and answers and a Gravity Forms bid form: a unit price per line, lead time in days, how long the quote is valid, notes and file uploads for their own quotation or data sheets. Because the form asks for a price per line and the add-on does the multiplication, every bid arrives in the same shape.

Suppliers can come back and change their bid until the deadline. The form opens with their last prices filled in, each change becomes a new version, and they get a confirmation with their total each time. That alone removes the “please ignore my previous e-mail” messages that make inbox RFQs so confusing.

Step 5: keep bids sealed until the deadline

The buyer view of a sealed RFQ before the deadline: a lock with 2 bids received and no prices, bidders or files, above the supplier list
Before the deadline the buyer only sees the number of bids.

With sealed bids switched on, the buyer screen shows a lock and the number of bids received — nothing else. No prices, no totals, no notes, no files and not even which suppliers have bid. The buyer’s “bid received” e-mail only gives the count, and the audit log records each bid without naming the bidder until the deadline.

How bids are stored matters as much as what the screen shows. The add-on uses Gravity Forms only as the input form: every bid is copied into the add-on’s own table and the Gravity Forms entry is deleted, so a sealed bid never shows up under Forms → Entries. The bid form’s notifications are switched off for the same reason. Uploaded files are moved to a protected folder under random names and are only handed out after a permission check: to the supplier who uploaded them through their own link, or to the buyer once the deadline has passed.

Step 6: answer questions once, for everyone

Good suppliers ask good questions: can we quote 6 mm plate instead of 5 mm, is delivery to the loading bay or to the floor, do you accept a split delivery? Suppliers ask from their page, and the question reaches the buyer with the name of the supplier who asked. The buyer checks the wording, writes the answer and publishes it. The answer then appears on every supplier’s page and goes out by e-mail to every invited supplier, one e-mail each, without the asker’s name. Everybody prices on the same information and nobody learns who asked.

Step 7: enforce the deadline

At the deadline the request closes on the server. The supplier page shows that bids are no longer accepted, and a bid form that was already open in a browser is refused when it is submitted, with a clear message that the deadline has passed; the supplier’s earlier bid stays exactly as it was. The audit log records the refused attempt. Because the time is checked on your server, the clock on the supplier’s computer makes no difference.

Step 8: compare, score and award

The comparison after the deadline: suppliers side by side ranked by weighted score, line totals with the lowest highlighted in green, lead time, validity, scores and the awarded supplier
After the deadline: side by side, scored and awarded.

After the deadline the comparison opens. Suppliers sit side by side, ranked by weighted score. Each line shows every supplier’s line total and unit price with the lowest highlighted, followed by the totals, lead times, validity, notes and files. Enter your marks for your own criteria and the weighted score updates.

Here is a worked example with three bids for brackets, bolts and delivery. The totals are 1,510.00, 1,500.00 and 1,556.00, the lead times 14, 21 and 10 days, and the quality marks 8, 6 and 9. With weights of 60 for price, 20 for lead time and 20 for quality, the weighted scores are 89.89, 81.52 and 95.84. The cheapest bid comes last because it is a week slower and marked lowest on quality; the dearest bid wins because it is fastest and marked best. That is exactly the kind of decision that is easy to defend later, because the weights were set before any price arrived and the maths is visible on screen.

To award, press the award button next to the chosen supplier. They get an e-mail that their bid was accepted. Every other supplier who bid gets a polite “not successful” e-mail that does not name the winner or its price. The request is marked as awarded, and the CSV and PDF summary of the comparison are one click away for your files or your finance team.

How this differs from other ways of handling quotes

GravityExtra has several add-ons with “bid” or “quote” in their description, and Gravity Forms has its own templates, so it is worth being clear about which tool does what:

  • Silent Auction lets visitors bid upwards on items you sell. Supplier RFQ is the opposite direction: invited suppliers send you sealed prices for things you buy, and nobody sees anyone else’s bid.
  • Quote PDF creates a quotation from an entry and sends it to your customer. Supplier RFQ collects and compares the quotations your suppliers send you.
  • Judging lets a panel score applications or entries. Supplier RFQ scores supplier bids, with price and lead time calculated from the bids and your own criteria marked by the buyer.
  • The Gravity Forms request-a-quote template lets your customers ask you for a price. It has no supplier list, private links, deadline, sealing, line-by-line pricing or comparison.

A checklist for your next request for quotation

  • Write the request as line items with quantities and units, and attach the drawing or specification.
  • Set a deadline that gives suppliers enough working days, and say in the description which time zone it is in.
  • Choose your scoring weights before you invite anybody.
  • Invite at least three suppliers, each with their own link.
  • Keep bids sealed unless you have a good reason not to.
  • Answer every useful question for all suppliers, without naming the asker.
  • Do not extend the deadline for one supplier; if you must extend it, extend it for everybody.
  • Score, award, send the “not successful” e-mails and keep the PDF summary with your purchase order.

Privacy and security

Everything runs on your own WordPress site. Suppliers do not need an account; they work through a signed private link that only opens their own page. Bid files and documents are stored in a protected folder under random names. The buyer screens need a dedicated capability, which administrators and the included RFQ buyer role have. The add-on makes no outside HTTP request beyond checking gravityextra.com for your licence and plugin updates. For every screen and setting in detail, read the Supplier RFQ documentation.

Wrapping up

A request for quotation does not need dedicated procurement software to be fair and well documented. With clear line items, private links, sealed bids, a server-side deadline, shared answers and transparent scoring, a WordPress site with Gravity Forms can run the whole process and leave a tidy record behind. Ready to run your next request for quotation the clean way? Get Gravity Forms Supplier RFQ & Bid Comparison.

0
0
Your Cart
Your cart is emptyReturn to Shop
🔥 FREQUENTLY BOUGHT TOGETHER
Complete Combo & Save 40%!
ITEM IN YOUR CART
Gravity Forms Klaviyo Add-on
$39.00/yr
+
🎁 RECOMMENDED ADD-ON SAVE 40% OFF
Original Price: $39.00/yr
Bundle Special Price: $23.40/yr